Tariff drama? Not here. Every order ships with zero surprise fees.

Tariff drama? Not here. Every order ships with zero surprise fees.

Loading...
Loading...

SKU: SKU: INDAEPS

Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only) - AEPS

<p>Earn%20[points_amount]%20when%20completing%20this%20purchase.</p>
Customers also viewed

Industrial Injection 7.3L AE Power Stroke Reman Stock Exchange Injector

Our Ford 7.3L re-manufactured injectors are built with all new internal fuel plungers, nozzles/nozzle springs and OE internal and external O-ring kits. Each oil valve is re-manufactured to OE specs and measures at .004" armature clearance (We do not shim our oil valves). After the precision assembly process, each injector is calibrated on our state of the art Hartridge HA230 injector calibrator to insure a true 4cc cylinder to cylinder fuel delivery.

Fitment Notes: #8 cylinder only 1999-2003 Ford F-Series, E-Series (Built after 12/07/98)

-Stock Replacement Injector for 1999-2003 Ford F-Series, E-Series (Built after 12/07/98) Diesels.

Search